| Project Type: | RFP |
| Project Owner: | Florida Department of Transportation |
| Location: | Florida, United States, Hardee (FL), De Soto (FL), Zolfo Springs (FL), Arcadia (FL), 34265 |
| Estimated Value: | $242,195 |
| Estimated Jobs: | N/A - Congressional Budget Office As compared with 3 - White House Council of Economic Advisors |
| Category: | Construction - Roadways, Design-Build, A/E - Transportation |
| Market Sector: | State/Municipal |
| Bid Number: | E1I18 |
| Publication Date: | 02/16/2010 |
| Submittal Date: | 03/18/2010 |
| Contact Information: | Email: contracts.admin@dot.state.fl.us Phone: 1-813-975-6036 Fax: 1-850-922-6017 Address: 605 Suwannee Street,Mail Station 55, Room B-1, Tallahassee, FL, 32399 |
|
|
Description:
|
FEDERAL ECONOMIC RECOVERY SPENDING
Letting Date: 20100318
Name: Design Build sidewalk rehabilitation and construction
Description: Project Description: The Florida Department of Transportation (Department) is issuing this Request for Proposal(RFP) to solicit competitive bids and proposals from Proposers for the Design and Construction of FPID 428164-1, FAP No. ARRA 611 B and FPID 428077-1 and FAP No. ARRA 610 B, sidewalk rehabilitation and construction in the City of Arcadia and the City of...
FEDERAL ECONOMIC RECOVERY SPENDING
Letting Date: 20100318
Name: Design Build sidewalk rehabilitation and construction
Description: Project Description: The Florida Department of Transportation (Department) is issuing this Request for Proposal(RFP) to solicit competitive bids and proposals from Proposers for the Design and Construction of FPID 428164-1, FAP No. ARRA 611 B and FPID 428077-1 and FAP No. ARRA 610 B, sidewalk rehabilitation and construction in the City of Arcadia and the City of Zolfo springs. The limits for FPID 428164-1, is Polk St. from Magnolia St. to Hickory St. sidewalk rehabilitation in Arcadia, Desoto County. The limits for PID 428077-1, is 4th Street from US 17 to shoolhouse Rd. sidewalk construction in Zolfo Springs. American Recovery and Reinvestment Act of 2009 - This project has been identified by the Department for advertisement and award subject to criteria and conditions established under the American Recovery and Reinvestment Act of 2009 (also known as the federal Economic Stimulus Bill). There will be federal reporting requirements associated with this project, such as monthly reports of number of jobs created and the number of jobs retained by the project or activity. The exact nature and extent of the reporting requirements and format for data collection are not fully known at this time but will be provided by the Department when made available by Federal Highway Administration. DESIGN BUILD TEAM REQUIREMENTS: The Contractor and Design Professionals cannot be on more than one team. The secondary member (i.e., designer or contractor) of the design build team cannot change, after award, without the written approval of the District Secretary. A professional firm shall not submit a proposal for Construction Engineering and Inspection (CEI) services, either as a Prime or a Sub-Consultant, for a Design Build contract for which the same firm or its affiliate is the Engineer of Record (EOR) or is Sub-Consultant to the EOR, without the written approval of the District Secretary. A consultant firm, its affiliate, or sub-consultant that is under contract with the Department to develop the Request for Proposal for a Design Build contract cannot be a part of a Design Build Team proposing on that contract as a prime or sub-consultant. A consultant firm, its affiliate, or sub-consultant, that is under contract with the Department to provide Construction Engineering and Inspection (CEI) services on the Design Build contract cannot be a part of a Design Build Team proposing on that contract as a prime or sub-consultant, without the written approval of the District Secretary. PREQUALIFICATION: Pre-qualification requirements for Design Build Advertisement for the contractor and design Professional members of the Design Build Team must be in accordance with the following (Rule Chapter 14-91 F.A.C.): (1) Contractor submitting as a lead or primary party with the design build team must be qualified in the advertised Construction Contractor Work Classes, in accordance with the provisions of Rule Chapter 14-22, F.A.C. (2) Requirements under Rule 14-75, F.A.C. - the Lead Designer and/or sub-consultant(s) can be utilized to meet the advertised Professional Services Work Type(s) requirements listed herein. (3) When a joint venture party submits a Letter of Interest, one of the contractor members of the joint venture party must be assigned to meet the advertised Construction Contractor Work Class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the design professional member(s), and sub-consultant(s) of the team will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule Chapter 14-75, F.A.C. RESPONSE PROCEDURE: Pre-qualified firms interested in being considered for the project should complete the questionnaire (that has been attached to the Draft Request for Proposal) and return it to the following E-Mail Address: D1-Designbuild@dot.state.fl.us Questionnaires will be accepted until the actual Pre-Proposal Meeting. PRE-BID CONFERENCE: Proposal forms (Bid Packages) will be issued only to attendees of the Mandatory Pre-Bid Conference. This project has a Mandatory Pre-Proposal Meeting on February 26, 2010, at 1:15 PM, at the Bartow District Office, 801 North Broadway Ave., Bartow, Florida, 33830. Plans, Specifications and Proposal Packages will no longer be available after the Mandatory Pre-Proposal Meeting. Design Build Firms must attend the pre-Proposal Meeting to be eligible to submit Bid Proposals and Technical Proposals for this project. LATE ARRIVALS TO MANDATORY PRE-BID CONFERENCE: All bidders must be present and signed in prior to the start of the Mandatory Pre-Bid Conference. Anyone not signed in at the commencement of the meeting will be considered late and will not be allowed to bid on the project. Financial Management Number(s): 428164-1-52-01, FAP No. ARRA 611 B and FPID 428077-1, FAP No. ARRA 610 B PROTEST RIGHTS: """"Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes."""" Financial Management Number(s): 42807715201 Budget Amount : $242,195 Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Sidewalk Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design Technical Questions Should Be Addressed To: Technical Questions Should Be Addressed To: Prior to letting, direct questions through: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Bidders shall take responsibility to review and be familiar with all questions and responses posted on this website up through (14) fourteen business days prior to the bid opening and make any necessary adjustments in the proposal accordingly. Bonding Requirements: Bonding Requirements: Firms submitting bids will be required to provide a 5% bid bond for each bid in excess of $150,000.00. The legal entity contracting with the Department must provide evidence of its ability to obtain Professional Liability Insurance covering errors and Omissions in the amount of $1,000,000.00. Evidence shall be in the form of a letter from an insurer or a Florida Resident Agent for an insurer indicating ability to provide such insurance. The insurer must be licensed to do business in the State of Florida. Project specific insurance is insurance covering only this project. The legal entity contracting with the Department must have a bonding capacity of at least the bid amount for a single contract. Said legal entity must provide evidence of its ability to be bonded for a single contract in the amount of at least the bid amount. Evidence of this single contract bonding capacity may be in the form of either a letter from the said legal entity's Surety Company indicating a single contract bonding capacity in excess of the bid amount or a copy of a performance and payment bond issued within the past twelve months, in the amount of at least the bid amount for any past single contract of said legal entity. The Surety Company must be authorized to do business in the State of Florida. View proposed scope (Adobe Acrobat PDF file) Advertisement Date : 15FEB2010 Response Due Date : 18MAR2010 Planned Pre-Bid Meeting Date : 26FEB2010 Time: 1:15 PM Planned Bids Due Date : 18MAR2010 Time: 1:00 PM Planned Bid Opening Date : 18MAR2010 Time: 2:30 PM Planned Final Sel. Meeting Date: 23MAR2010 Time: 1:00 PM Response Deadline : 18MAR2010 Respond To: Florida DOT - District 1 P.O. Box 1249 / 801 N Broadway Ave Bartow, FL 33831-1249 Attn: Felipe Alvarez Professional Services, MS 1-67 Phone: (863)519-2610
Letting Time: 2.00 PM
Letting Address:
District One Office, FDOT
801 North Broadway Ave.
Bartow, FL 33830
Read More
Show Less
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OIL DRY COMPOUND
|
| Location: | Hamilton, Ohio |
| Industry: | Environmental Products - Spill cleanup, liners |
|
|
|
|
|
|
Removal of Ice Storm Debris
|
| Location: | North Carolina |
| Industry: | Solid Waste, Incineration, Landfill, Haz-Mat Facilities Construction and Associated Equipment, O&M - Garbage, Refuse and Solid Waste Collection |
|
|
Water Line Extension
|
| Location: | Falmouth, Kentucky |
| Industry: | Construction - Water Supply, Sewer, Well Drilling, Treatment, Distribution and Disposal |
|
|
|
|
|
|