| Project Type: | Presolicitation |
| Project Owner: | US Department of Transportation, Federal Aviation Administration, Northwest Mountain Region |
| Location: | Washington, Colorado, United States, King (WA), Weld (CO), Boulder (CO), Renton (WA), Longmont (CO), 80504 |
| Estimated Value: | $1,000,000 to $250,000,000 |
| Estimated Jobs: | N/A - Congressional Budget Office As compared with 2725 - White House Council of Economic Advisors |
| Category: | Construction - Garages, Vehicle Maintenance Facilities, Parking Deck, Parking |
| Market Sector: | Federal |
| Bid Number: | DTFANM-09-R-00074 |
| Publication Date: | 05/05/2009 |
| Submittal Date: | 05/08/2009 |
| Contact Information: | Angela Mihalek Email: Angela.Mihalek@faa.gov Phone: 1-425-227-1150 Fax: 1-425-227-1055 Address: 1601 Lind Ave. S.W, Renton, WA, 98057 |
|
|
Description:
|
FEDERAL ECONOMIC RECOVERY SPENDING
99--RECOVERY - Pre-solicitation Announcement for Parking Lot Renovation at the Air Route Traffic Control Center (ARTCC), located in Longmont, Colorado
Solicitation Number: DTFANM-09-R-00074
Agency: Department of Transportation
Office: Federal Aviation Administration (FAA)
Location: Northwest-Mountain Region
General Information
Posted Date:
May 5, 2009
Response Date:
May 08, 2009 11:59 pm
Original Set Aside:
N/A
Set Aside:
N/A
Classification...
FEDERAL ECONOMIC RECOVERY SPENDING
99--RECOVERY - Pre-solicitation Announcement for Parking Lot Renovation at the Air Route Traffic Control Center (ARTCC), located in Longmont, Colorado
Solicitation Number: DTFANM-09-R-00074
Agency: Department of Transportation
Office: Federal Aviation Administration (FAA)
Location: Northwest-Mountain Region
General Information
Posted Date:
May 5, 2009
Response Date:
May 08, 2009 11:59 pm
Original Set Aside:
N/A
Set Aside:
N/A
Classification Code:
99 -- Miscellaneous
Contracting Office Address: FEDERAL AVIATION ADMINISTRATION, ANM-52 ANM - Northwest Mountain
Solicitation Number: DTFANM-09-R-00074
Notice Type: Presolicitation
Synopsis: Added: May 05, 2009 2:30 pm
THIS IS A PRESOLICITATION NOTICE ONLY.
Phase I of the procurement process will be posted to faaco.faa.gov shortly to include all necessary materials/information to submit your proposal.
I. Project Scope:
Complete Overexcavation, Backfill & Asphalt w/ 2 Lifts: (approx 7,600 SY)Remove existing pavement and base material by Overexcavation, install aggregate sub-base compacted to 10" and install new asphalt pavement in two equal lifts rolled to 8" total thickness. This work category to be broken into at least three work areas.
Rotomill & Overlay: (approx 13,200 SY)Rotomill off 1/2" from the existing asphalt pavement, repair/patch defective pavement areas, and install a new 2" asphalt pavement surface course. This work category to be broken into at least five work areas.
Remove Asphalt, Compact & Re-Asphalt w/ 2 Lifts: (approx 7,900 SY)Remove existing approximately 4" asphalt pavement only, Proof roll existing roadbase, replace defective roadbase areas, and install new asphalt pavement in two equal lifts rolled to 6" total thickness. This work category to be inclusive within one work area.
Seal Coat: (approx 4,200 SY)Install two Bituminous Seal Coats. This work category to be broken into at least two work areas.
Paint Striping: (approx 33,000 SY)Perform new Layout and repaint ALL existing parking lot markings, including yellow & white striping, directional arrows, handicapped symbols, and curbing, assume painting for after new seal coat application or new pavement. Painting to be phased in up to 5 main areas.
Concrete Curb/Gutter and Sidewalk Repair.Replace various sections of concrete curb & gutter as well as various portions of concrete sidewalk sections throughout parking lot area.
Paving work will be coordinated around a secured government facility operating 24 hours a day, 7 days a week with employee parking, delivery trucks, and other traffic flow issues to be temporarily partitioned off, barricaded, clearly signed, and coordinated throughout the paving repair work.
Award is anticipated in June 2009 with construction to begin in early July 2009.
Magnitude of construction: Between $1,000,000 - $250,000,000
II. Procurement Process. (a) Phase I - Screening Information Requests (SIR). Review and evaluation of each offeror's technical proposal. A submitted technical proposal must be deemed to be either "acceptable" or "not acceptable". The Contracting Officer will promptly notify results of the evaluation to each offeror in writing.
(b) Phase II - Request for Offer (RFO). Issuance of the solicitation documents. Those offerors with "acceptable" proposals in response to this SIR will be sent a complete solicitation package inclusive of plans and specifications, and contract terms and conditions. Issuance of the solicitation package to selected qualified offerors is scheduled for late May.
(c) Award review and selection. Subject to availability of funds, contract award may be made to the responsible offeror presenting the technically acceptable proposal, which is considered to be the greatest value to the government regarding price, terms and conditions.
If viewing this announcement from a source other than Federal Aviation Adminstration Contract Opportunities (FAACO), please visit http://faaco.faa.gov/ for the original.
Additional Info: FAA Contract Opportunities
Point of Contact(s): Angela Mihalek, (425) 227-1150
angela.mihalek@faa.gov
Read More
Show Less
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
PHL Addition
|
| Location : | Shoreline, Washington |
| Industry : | Construction - Office / Retail Buildings, Construction - Renovation, Rehabilitation and Historic Preservation |
|
|
|
|
|
|
|
|
|
|